Compare
Under-joist vs between-joist deck drainage
Under-deck drainage either hangs below the joists or tucks between them, under the boards. The question that decides it for most homeowners: do your deck boards have to come up?
Side by side
| Feature | Under the joists (ours) | Between or over the joists |
|---|---|---|
| Where it goes | Below the joists, with the deck boards in place | Between or over the joists, under the deck boards |
| Material | Aluminum with a baked-on finish | Varies. Aluminum channels or a membrane, depending on the system. |
| Rust and corrosion | Aluminum doesn't rust | Depends on the material |
| Install on an existing deck | Yes, from below. Most decks take 1–3 days. | Yes, with the deck boards lifted |
| Deck boards removed? | No | Yes, then put back |
| Best time to install | Existing decks, or new ones once the framing and decking are done | During a new build, before the boards go down |
| Headroom used | Typically 3–5 in. below the joists | The drainage sits between the joists, not below them |
| Cleaning and access | Hose rinse; panels unclip for a deeper clean | Gutters and downspouts still need cleaning |
| Lighting options | Flush star lights, plus mounts for fans, surface lights and heaters | A finished ceiling below can take recessed lights, fans and speakers |
| Typical installed cost | Priced per deck from its size and photos, labor and materials included. | Varies. On an existing deck, the job includes lifting and relaying the boards. |
Other systems differ by maker and installer, so where we say “varies”, ask for the specifics. Get a quote for your deck
When a between-joist system is the better choice
You're building a new deck
The joists are open before the boards go down, which is when these systems are meant to go in. On a new build, downspouts can be hidden inside columns.
Your deck boards are coming off anyway
If you're replacing the decking, the joists will be open regardless. Some systems also cover the tops of the joists with an ice-and-water shield while they're exposed.
You want the drainage hidden and recessed lights
The drainage sits up between the joists, hidden by a finished ceiling below. That ceiling can take recessed lights, fans and speakers.
How to choose
Ask whether the boards are coming off anyway. If you're building or re-decking, look at a between-joist system. If not, an under-joist ceiling leaves them alone.
Measure from the patio to the bottom of the joists, then ask each installer how much of that their system takes.
On a new build, decide before the decking goes down, and talk to your builder early.
Ask how you would reach the gutter, downspout and drainage later.
Questions about under-joist and between-joist systems
Do you have to remove my deck boards?
No. On a deck that's already built, we do all of the work from underneath, below your joists. Nothing on the deck surface changes. Systems that go between or over the joists sit under the boards, so on an existing deck the boards come off and go back on.
Which is better for a new deck?
Either can work. A between-joist system goes in while the joists are open, before the decking. Ours goes in after: we coordinate with your builder and install once the framing and decking are done.
Which uses less headroom?
A between-joist system puts the drainage up between the joists rather than below them. Ours sits below them, typically 3–5 in. below the joists.
Can I get recessed lights?
A between-joist system with a finished ceiling below can take recessed lights, fans and speakers. Ours takes flush star lights set into the panels, plus mounts for fans, surface lights and heaters.
Get started
Get a firm price within one business day.
No account and no sales call needed. Photos usually let us quote without a site visit.